项目

一般

简介

行为

功能 #2537

已关闭

功能 #2519: Ford_SYSR: System Requirement

Ford_SYSR:FS_REQ0017_V2 LB Activation

玉洁 金8 个月 之前添加. 更新于 2 个月 之前.

状态:
已关闭
优先级:
普通
指派给:
开始日期:
2024-10-29
计划完成日期:
2024-11-15
% 完成:

100%

预期时间:
(合计: 0.00 小时)

描述

For the definition of the operational state of the LB, the voltage level of the LB supply terminal of the BCM (‘L/RF_Low_Beam_Ckt’) must be used.
• Voltage equal to or above 8V, LB ON
• Voltage less than 6V, LB OFF

This voltage will be applied to connector C pin 10 “Power Supply Channel 1”. The output of channel 1 should always be applied to Main LB and no other function.

Any additional channels assigned to Low Beam should also activate based on this signal.

NOTE: If LB recover from OFF to ON, a 0.5V hysteres is needed.


子任务 3 (0 打开3 已关闭)

功能 #2787: Ford_SWER_0017_0001:LB Activation conditions 已关闭捷 陈2024-10-292024-11-15

行为
功能 #2905: Ford_SWER_0017_0002:LB Activation restriction已关闭云浩 汪2024-10-292024-11-07

行为
功能 #2925: Ford_SWER_0017_0003:LB additional channels已关闭云浩 汪2024-11-012024-11-07

行为
行为

导出 Atom PDF