功能 #2537
已关闭功能 #2519: Ford_SYSR: System Requirement
Ford_SYSR:FS_REQ0017_V2 LB Activation
开始日期:
2024-10-29
计划完成日期:
2024-11-15
% 完成:
100%
预期时间:
(合计: 0.00 小时)
描述
For the definition of the operational state of the LB, the voltage level of the LB supply terminal of the BCM (‘L/RF_Low_Beam_Ckt’) must be used.
• Voltage equal to or above 8V, LB ON
• Voltage less than 6V, LB OFF
This voltage will be applied to connector C pin 10 “Power Supply Channel 1”. The output of channel 1 should always be applied to Main LB and no other function.
Any additional channels assigned to Low Beam should also activate based on this signal.
NOTE: If LB recover from OFF to ON, a 0.5V hysteres is needed.