项目

一般

简介

行为

功能 #2987

已关闭

功能 #2519: Ford_SYSR: System Requirement

功能 #2980: Ford_SYSR:FS_REQ0018&REQ0020_V1 High Beam

Ford_SWER:FS_REQ0018&REQ0020_0005 High Beam BCM EEL LIN ramping for App

玉洁 金8 个月 之前添加. 更新于 7 个月 之前.

状态:
已关闭
优先级:
普通
指派给:
开始日期:
2024-10-31
计划完成日期:
2024-11-07
% 完成:

100%

预期时间:

描述

If APP read the value of 'HB_Ramping_method_cfg' in the dataset is selected as BCM EEL LIN BCM ,the fade speed will be issued by LIN command‘LDM_HB_RampingSpeed’;
There are four possibilities for‘LDM_HB_RampingSpeed’:Immediate、Fast、Medium and Slow speed;
1、if ‘LDM_HB_RampingSpeed’= Immediate,HB immediately activate/deactivate;
2、if ‘LDM_HB_RampingSpeed’= Fast,it will read the fade time(‘HB_fade_fast_spd_cfg’) configured in the dataset;
3、if ‘LDM_HB_RampingSpeed’= Medium,it will read the fade time( ‘HB_fade_med_spd_cfg’) configured in the dataset;
4、if ‘LDM_HB_RampingSpeed’= slow,it will read the fade time(‘HB_fade_slow_spd_cfg’) configured in the dataset;

行为 #1

玉洁 金 更新于 8 个月 之前

  • 描述 已更新。 (差异)
行为 #2

玉洁 金 更新于 8 个月 之前

  • 主题Ford_SWER:FS_REQ0018&REQ0020_0005 High Beam BCM EEL LIN ramping 变更为 Ford_SWER:FS_REQ0018&REQ0020_0005 High Beam BCM EEL LIN ramping for APP
  • 描述 已更新。 (差异)
行为 #3

玉洁 金 更新于 8 个月 之前

  • 主题Ford_SWER:FS_REQ0018&REQ0020_0005 High Beam BCM EEL LIN ramping for APP 变更为 Ford_SWER:FS_REQ0018&REQ0020_0005 High Beam BCM EEL LIN ramping for App
行为 #4

斌 徐 更新于 8 个月 之前

  • 计划完成日期2024-11-01 变更为 2024-11-07
  • 状态新建 变更为 已解决
  • 指派给涛 陆 变更为 云浩 汪
  • % 完成0 变更为 100

编写测试用例

行为 #5

斌 徐 更新于 7 个月 之前

  • 状态已解决 变更为 已关闭
行为

导出 Atom PDF