项目

一般

简介

行为

功能 #2542

已关闭

功能 #2519: Ford_SYSR: System Requirement

Ford_SYSR:FS_REQ0022_V2 High Beam EEL Front Fog Activation Reaction

玉洁 金8 个月 之前添加. 更新于 7 个月 之前.

状态:
已关闭
优先级:
普通
指派给:
开始日期:
2024-10-31
计划完成日期:
2024-11-14
% 完成:

100%

预期时间:
(合计: 0.00 小时)

描述

The parameter ‘HB_combined_Front_fog_cfg’ describes the handling of HB deactivation in case of front fog activation. In case the parameter ‘HB_combined_Front_fog_cfg’ is set to 0 the LDM shall activate/deactivate HB as specified in this chapter. As soon as command signal 'Front_Foglamp_Rqst' = 0x01h AND configuration parameter ‘HB_combined_Front_fog_cfg’ <> 0x00h, the HB shall be faded out to 0% according to the content of the configuration parameter ‘HB_combined_Front_fog_cfg’.
• 0x00: Invalid
• 0x01: Fade in 100ms
• 0x02: Fade in 150ms
• 0x03: Fade in 200ms


子任务 2 (0 打开2 已关闭)

功能 #2841: Ford_SWER_0022_0001:High Beam EEL Front Fog Activation Reaction for App已关闭涛 陆2024-11-072024-11-14

行为
功能 #2997: Ford_SWER_0022_0002:High Beam EEL Front Fog Activation Reaction for dataset已关闭培源 左2024-10-312024-11-01

行为
行为 #1

涛 陆 更新于 8 个月 之前

未完成

行为 #2

斌 徐 更新于 8 个月 之前

  • 目标版本H003_SW0007169.A001.8 变更为 H004_SW0007169.A002.0
行为 #3

斌 徐 更新于 8 个月 之前

  • 状态新建 变更为 反馈
行为 #4

玉洁 金 更新于 8 个月 之前

  • 主题Ford_SYSR:FS_REQ0022_V1 High Beam EEL Front Fog Activation Reaction 变更为 Ford_SYSR:FS_REQ0022_V2 High Beam EEL Front Fog Activation Reaction
  • 描述 已更新。 (差异)
行为 #5

斌 徐 更新于 7 个月 之前

  • 状态反馈 变更为 已解决
  • 指派给涛 陆 变更为 培源 左
行为 #6

斌 徐 更新于 7 个月 之前

  • 状态已解决 变更为 已关闭
  • 指派给培源 左 变更为 云浩 汪

回归测试

行为

导出 Atom PDF