行为
功能 #2539
已关闭功能 #2519: Ford_SYSR: System Requirement
Ford_SYSR:FS_REQ0019_V1 High Beam (HB) HCM EEL LIN Activation(Not in LDM4 scope)
开始日期:
2024-10-24
计划完成日期:
2024-10-31
% 完成:
100%
预期时间:
描述
In FNV2 HCM configuration the corresponding HCM HB commands will also activate the HB and/or HB2 as requested by ‘LDM_HB1/2_Ramping Speed’ in LDM Command of HCM, which are Immediate, Fast, Medium or Slow.
行为